Quantcast
Channel: RAM | STAAD Forum - Recent Threads
Viewing all articles
Browse latest Browse all 23543

In Staad Pro Select series 6, Concrete take off considers the steel quantity of the stirrups?

$
0
0

When checking the output Staad shows the following:

(FOR BEAMS, COLUMNS AND PLATES DESIGNED ABOVE)

NOTE: CONCRETE QUANTITY REPRESENTS VOLUME OF CONCRETE IN BEAMS, COLUMNS, AND PLATES DESIGNED ABOVE.
REINFORCING STEEL QUANTITY REPRESENTS REINFORCING STEEL IN BEAMS AND COLUMNS DESIGNED ABOVE.
REINFORCING STEEL IN PLATES IS NOT INCLUDED IN THE REPORTED QUANTITY.

TOTAL VOLUME OF CONCRETE = 206.8 CU.METER

BAR SIZE WEIGHT
NUMBER (in lbs)
-------- --------
10 2829
12 83
16 6993
20 4799
25 16347
32 7578
40 9115
------------
*** TOTAL= 47744

In this quantity, Staad is considering the stirrups?


Viewing all articles
Browse latest Browse all 23543

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>