please anybody tell me, when should i take nodes for the design of PEB(pre-engineered building), for columns and rafters,
i know that,
when a new member is started or when load is changed or we are connecting new members to coumn or rafter we take nodes at that point.
other than this, is there any other criteria on which the selection of nodes depends.