Thanks Mr. Tank...by the way the post is supporting one of the base of heat exchanger, so Im worried of this 4mm deflection because my checking the allowable deflection is 230/200 equals 1.15mm thus failed and also we are limited to HEB and IPE sections for the beams. Is it safe not to increase my beam size and neglect the 4mm deflection? Thanks
↧