A couple of users have noted this. The program was designed such that connections are reported in the connections detail report in the order that the connections are assigned regardless the joint order they are assigned to. You can always print the connections one at a time or export the output to Word if you want to change the order. Or you can assign connections in the same order as the joints are listed.
↧